Working Inside Out
Having taken down the masonry piers above first floor level, the elevation is wide open. Scaffold netting is supposed to allow ventilation, but prevent rain getting in. This is only partially successful, rainwise, but it does provide a nice shady interior in summer.
The front wall box plywood beam is almost complete, to which the reclaimed floor joists will be fixed.
There is a large reinforced concrete beam over the old entrance door which will be a challenge to remove.